Kitchen Remodel Timeline: How Long Does It Take in Wilmington NC? (2026)
How long does a kitchen remodel take in Wilmington NC? Week-by-week timeline from design to completion. Minor 3-5 weeks, mid-range 6-10 weeks, major 10-16 weeks.
Kitchen Remodel Timeline Overview
Every kitchen remodel follows a predictable sequence, but the total duration depends on scope. Here's what to expect at each level based on our experience with hundreds of Wilmington kitchen projects.
Minor Kitchen Update: 3-5 Weeks
What's included: Cabinet refacing or painting, new countertops, updated hardware, new backsplash, fresh paint.
Week-by-Week:
- Week 1: Demo existing countertops/backsplash, prep cabinets
- Week 2: Cabinet refacing or painting, electrical updates
- Week 3: Countertop template and fabrication
- Week 4: Countertop installation, backsplash tile
- Week 5: Hardware, paint touch-ups, final details
Partial kitchen use: Usually possible — sink and appliances often remain functional.
Mid-Range Kitchen Remodel: 6-10 Weeks
What's included: New cabinets, countertops, backsplash, flooring, lighting, appliances, sink and faucet.
Week-by-Week:
- Weeks 1-2: Demo existing kitchen, rough plumbing and electrical
- Week 3: Drywall repair, paint prep, flooring installation
- Weeks 4-5: Cabinet installation (once delivered from manufacturer)
- Week 6: Countertop template → fabrication (2-3 week lead time)
- Weeks 7-8: Countertop installation, backsplash, plumbing connections
- Weeks 9-10: Appliance installation, hardware, paint touch-ups, final details
Note: Cabinet lead time (4-8 weeks from order) happens BEFORE construction begins. Smart scheduling means ordering cabinets during the design phase.
Major Kitchen Renovation: 10-16 Weeks
What's included: Layout changes, wall removal, new cabinets, premium countertops, custom backsplash, new flooring, all new appliances, updated plumbing and electrical, lighting design.
Week-by-Week:
- Weeks 1-2: Full demo, structural assessment, wall removal
- Weeks 3-4: Structural work (headers, supports), rough plumbing relocation, electrical panel upgrades
- Weeks 5-6: Insulation, drywall, subfloor prep
- Weeks 7-8: Flooring installation, painting
- Weeks 9-10: Cabinet installation
- Weeks 11-12: Countertop template, fabrication, installation
- Weeks 13-14: Backsplash, plumbing connections, electrical trim
- Weeks 15-16: Appliances, hardware, final punch list, cleanup
The Hidden Timeline: Pre-Construction
Before any construction begins, plan for:
Design Phase (2-4 weeks)
- Initial consultation and measurements
- Design concepts and revisions
- Material selections (cabinets, countertops, tile, fixtures)
- Final design approval
Ordering Phase (4-8 weeks)
- Custom cabinet order and fabrication
- Specialty tile or material orders
- Appliance orders (some have 4-12 week lead times)
Permitting (1-3 weeks)
- Building permit application
- Plan review and approval
- Required for any structural, plumbing, or electrical work
Pro tip: Order cabinets and long-lead materials during the design phase so they arrive when construction is ready for them. This can save 4-8 weeks off your total timeline.
5 Tips to Keep Your Remodel on Schedule
1. Make all selections before construction starts — Changing your mind on tile after demo adds weeks
2. Order cabinets early — They're always the longest lead time
3. Set up a temporary kitchen — Microwave, coffee maker, paper plates in another room
4. Be available for decisions — Quick answers prevent delays
5. Budget 10-15% contingency — Hidden issues are common in older Wilmington homes
What Makes Swanson Construction Different
We provide a detailed, week-by-week project schedule before construction begins. You know exactly what's happening each week, and we communicate daily updates. Our dedicated project manager keeps everything on track so your kitchen is completed on time.
Ready to start planning? Schedule your free consultation or call (910) 443-4113.
Ready to Get Started?
Get a free, no-obligation estimate for your project from Wilmington's most trusted contractor.
Frequently Asked Questions
Brian Swanson
Owner & General Contractor at Swanson Construction and Development, Inc. With 30+ years of construction experience in coastal North Carolina, Brian founded Swanson Construction on the principle of doing it right the first time.
Read Brian's full story →Related Services
Kitchen Remodeling
Transform your kitchen with custom cabinets, countertops, and modern layouts tailored to your lifestyle.
From $8K
Bathroom Renovation
Upgrade your bathroom with new fixtures, tile work, and spa-like features for everyday comfort.
From $5K
Deck Building
Create the perfect outdoor living space with a custom-built deck designed for your property.
From $5K
Home Renovation
Revitalize your entire home with comprehensive renovation services from foundation to finish.
From $15K
